My builder's back!

Just a little peek as the sun is going down on the second day's work installing the wood siding to the backroom addition re-do project. Items remaining on the exterior include trim work around windows, doors, corner and freize boards, installation of outside electrical outlet and cover, installation of the outside wall light, new steps and railing at the back door, and a custom awning over the south-facing windows shown in the photo above. The awning on the south side will help keep out the hot high-angled sun rays in the summer and let in the low-angled sun rays in the winter. After the items on the exterior list are complete, we return to the inside to connect the wiring pulled through last fall, install the wallboard, trim, paint, and install the wood flooring, and chandelier. Ahhhhhh, it feels good to see progress again.